Chapter 01 · How-to guides
How to use the calendar
Read the Content calendar, move between weeks and months, reschedule planned ideas by dragging, and turn a planned day into a real article.
Updated Sep 21, 2026 · 4 min read
By the end you will be able to read the Content calendar at a glance, distinguish planned ideas from automated slots, and move an idea to another day. Planned dates are reminders while automation is paused; when it is active, the next slot on that day consumes the planned idea first.
Before you start
- You have at least one planned idea or one generated article. Otherwise the page shows Nothing on the calendar yet with Pick ideas and Generate now shortcuts.
- Planned ideas get their date when you save them with Plan idea. See How to save and schedule ideas.
- Rescheduling is drag and drop, so a mouse or trackpad is easiest.
Steps
- 1
Open the calendar
Choose Calendar in the sidebar. The heading reads Content calendar and the timeline combines planned ideas, violet automated slots, drafts, approvals and published articles.
- 2
Read the summary strip
Above the grid you see counts for Articles, Picked ideas and active schedule slots, plus filters including Scheduled. Filters only hide items; they never move them.
- 3
Read the grid
Weeks run Monday to Sunday and today is highlighted. Violet items are automated slots, amber items are planned ideas and drafts, indigo items are approved articles, green items are published ones, and grey items are rejected or failed.
- 4
Move between periods
Switch Month and Week at the top right. The arrows step one month or one week, and Today returns you to now. Week view gives every item more room.
- 5
Open a planned idea
Click an amber idea. A dialog labelled Idea shows its Angle, Planning date, Source and Keywords, plus the note This is a planning reminder only. Its only action is Remove from calendar.
- 6
Reschedule by dragging
Drag the idea to another day. The target day highlights as you hover, and a toast confirms Idea rescheduled to Sep 24 when you drop it.
- 7
Act on a planned day
With automation active, the next configured slot on that day writes from the planned idea automatically. To write sooner, go to Home, find it in Saved ideas, and press Use idea. Full manual steps are in How to create an article from an idea.
- 8
Open an article
Click any article item to open it in the article workspace. Drafts sit on the day they were generated, approved articles on the day they were approved, published ones on the day they went out.
What happens next
When a manual or automated draft is saved, its planned idea is marked as used and the draft appears in amber. Approving moves it to indigo and publishing to green, so one article never appears twice. If automation is paused, a planned idea stays where it is until you write, drag or remove it.
If something looks off
- A saved idea is missing from the calendar. It has no date. Only ideas planned with Plan idea appear; undated ideas live in Saved ideas on Home as your backlog.
- To fill an upcoming automated slot, click Content to be decided. Choose a saved or suggested idea, or write a topic for that exact time. Ideas already placed on a date can still be dragged to another day.
- Dragging did not stick and a toast says the reschedule failed. Try again. The idea keeps its old date until the change succeeds.
- An article shows on a different day than you expected. Articles use the date of their current status, not the day you planned the idea.
- The grid shows placeholder bars for a long time. The page loads articles and saved ideas together. Wait a moment, or reload once.
Go deeper
- Calendar and cadence is the full reference, including plan ceilings versus schedules.
- Saving, scheduling and dismissing ideas for the star, the panel and the schedule dialog.
- Planning a week of content for a routine that uses the calendar every week.
- Approval and auto-publish for what happens to an article after it is generated.
Common questions
Will auto-publish send an article on its planned date?
Only when the automated pipeline is enabled. Scheduler starts writing at configured slots, then sends the checked result to connections configured to receive scheduled articles automatically.
Can I plan further than a week ahead?
Yes. Plan idea offers seven days; after that, drag the idea to any day on the calendar.
Why is there no generate button on the calendar?
The calendar shows and moves reminders. Generation starts from Home or Articles, where the form lets you review the brief before anything runs.
Related guides
Calendar and cadence
What the Content calendar shows, how planned ideas fill automated slots, and how to configure your writing cadence.
Read guideSaving, scheduling and dismissing ideas
How the star, Plan idea, the Saved ideas panel and the calendar fit together, what a planning date does and does not do, and how idea feedback works.
Read guidePlanning a week of content
A practical routine for shortlisting ideas, putting reminders on the calendar, generating on the planned day, approving and publishing, and staying inside your monthly credits.
Read guide